Gas transmission pipeline · Arabian Gulf to Eastern Coast
Marjan GOSP-4 Gas Pipeline
Marjan GOSP-4 Gas Pipeline is an operating gas transmission pipeline in Saudi Arabia. The tracker lists 1 tracked segment, 100 km long and 7.67 bcm/y of capacity, starting up in 2024. It runs from Arabian Gulf to Eastern Coast. It is owned by Aramco.
Length
100 km
Capacity
7.67 bcm/y
5.6 Mtpa LNG equivalent
Segments tracked
1
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Arabian Gulf
- To
- Eastern Coast
- Start country
- Saudi Arabia
- End country
- Saudi Arabia
- Countries crossed
- Saudi Arabia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P7545
- Start year
- 2024
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Subsea Pipelines | Operating | Arabian Gulf → Eastern Coast | 100 | 7.67 | — | 2024 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
In the news
Recent headlines that name Marjan GOSP-4 Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Marjan GOSP-4 Gas Pipeline run?
- Marjan GOSP-4 Gas Pipeline runs from Arabian Gulf to Eastern Coast, crossing Saudi Arabia.
- How long is Marjan GOSP-4 Gas Pipeline?
- Marjan GOSP-4 Gas Pipeline is 100 km long.
- How much gas can Marjan GOSP-4 Gas Pipeline carry?
- Marjan GOSP-4 Gas Pipeline has a design capacity of 7.67 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Marjan GOSP-4 Gas Pipeline operating?
- Marjan GOSP-4 Gas Pipeline is operating, having started in 2024.
- Who owns Marjan GOSP-4 Gas Pipeline?
- Marjan GOSP-4 Gas Pipeline is owned by Aramco, as recorded in the current tracker release.
More gas pipelines in Saudi Arabia
Listed in name order among the 61 pipelines tracked in Saudi Arabia, so projects with the same name sit together. A browse aid, not a claim that they are alike.