Langalband–Gopalganj Gas Transmission Pipeline is a proposed gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 110 km long and 1.19 bcm/y of capacity, starting up in 2025. It runs from Langalbandh to Gopalgonj. It is owned by Gas Transmission Co Ltd (GTCL).

Length

110 km

Capacity

1.19 bcm/y

0.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Langalband–Gopalganj Gas Transmission Pipeline runs from Langalbandh to Gopalgonj. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Langalbandh
To
Gopalgonj
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
115 km
GEM pipeline ID
P0864
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedLangalbandh → Gopalgonj1101.19914 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Langalband–Gopalganj Gas Transmission Pipeline run?
Langalband–Gopalganj Gas Transmission Pipeline runs from Langalbandh to Gopalgonj, crossing Bangladesh.
How long is Langalband–Gopalganj Gas Transmission Pipeline?
Langalband–Gopalganj Gas Transmission Pipeline is 110 km long.
How much gas can Langalband–Gopalganj Gas Transmission Pipeline carry?
Langalband–Gopalganj Gas Transmission Pipeline has a design capacity of 1.19 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Langalband–Gopalganj Gas Transmission Pipeline operating?
Langalband–Gopalganj Gas Transmission Pipeline is proposed, with a reported start year of 2025.
Who owns Langalband–Gopalganj Gas Transmission Pipeline?
Langalband–Gopalganj Gas Transmission Pipeline is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.