LNG Chain

Gas transmission pipeline · Kutumbopur to Haripur

Kutumbopur-Meghnaghat-Haripur Transmission Pipeline

Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is a cancelled gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 67 km long and 2.56 bcm/y of capacity, starting up in 2021. It runs from Kutumbopur to Haripur. It is owned by Gas Transmission Co Ltd (GTCL).

Length

67 km

Capacity

2.56 bcm/y

1.9 Mtpa LNG equivalent

Segments tracked

1

Route

Kutumbopur-Meghnaghat-Haripur Transmission Pipeline runs from Kutumbopur to Haripur. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kutumbopur
To
Haripur
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
44 km
GEM pipeline ID
P0863
Start year
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledKutumbopur → Haripur672.562021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Kutumbopur-Meghnaghat-Haripur Transmission Pipeline run?
Kutumbopur-Meghnaghat-Haripur Transmission Pipeline runs from Kutumbopur to Haripur, crossing Bangladesh.
How long is Kutumbopur-Meghnaghat-Haripur Transmission Pipeline?
Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is 67 km long.
How much gas can Kutumbopur-Meghnaghat-Haripur Transmission Pipeline carry?
Kutumbopur-Meghnaghat-Haripur Transmission Pipeline has a design capacity of 2.56 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Kutumbopur-Meghnaghat-Haripur Transmission Pipeline operating?
Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is cancelled, with a reported start year of 2021.
Who owns Kutumbopur-Meghnaghat-Haripur Transmission Pipeline?
Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.