Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is a cancelled gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 67 km long and 2.56 bcm/y of capacity, starting up in 2021. It is owned by Gas Transmission Co Ltd (GTCL).
Length
67 km
Capacity
2.56 bcm/y
1.9 Mtpa LNG equivalent
Segments tracked
1
Route
Kutumbopur-Meghnaghat-Haripur Transmission Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 44 km
- GEM pipeline ID
- P0863
- Start year
- 2021
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Not reported | 67 | 2.56 | — | 2021 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Kutumbopur-Meghnaghat-Haripur Transmission Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Kutumbopur-Meghnaghat-Haripur Transmission Pipeline run?
- Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
- How long is Kutumbopur-Meghnaghat-Haripur Transmission Pipeline?
- Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is 67 km long.
- How much gas can Kutumbopur-Meghnaghat-Haripur Transmission Pipeline carry?
- Kutumbopur-Meghnaghat-Haripur Transmission Pipeline has a design capacity of 2.56 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Kutumbopur-Meghnaghat-Haripur Transmission Pipeline operating?
- Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is cancelled, with a reported start year of 2021.
- Who owns Kutumbopur-Meghnaghat-Haripur Transmission Pipeline?
- Kutumbopur-Meghnaghat-Haripur Transmission Pipeline is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.
More gas pipelines in Bangladesh
Listed in name order among the 61 pipelines tracked in Bangladesh, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Langalband–Gopalganj Gas Transmission Pipeline110 km
- Moheshkhali Zero Point-CTMS Gas Pipeline7 km
- Moheshkhali-Anwara Gas Transmission Pipeline91 km
- Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline77 km
- Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline250 km
- Kuchai-Chhatak Gas Pipeline39 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.