Gas transmission pipeline · Czechia – Germany
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is an operating gas transmission pipeline crossing Czechia, Germany. The tracker lists 1 tracked segment, 150 km long and 27.5 bcm/y of capacity, starting up in 2021. It is owned by Net4Gas.
Length
150 km
Capacity
27.5 bcm/y
20.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1397 mm (55 in)
Route
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline runs from Czechia – Germany. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Czech Republic
- End country
- Germany
- Countries crossed
- Czechia, Germany
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 141 km
- GEM pipeline ID
- P1698
- Start year
- 2021
- Estimated cost (GEM, US dollars)
- $589 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 150 | 27.5 | 1397 mm | 2021 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Net4Gas100%
Parent companies
In the news
Recent headlines that name Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline run?
- Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline runs from Czech Republic to Germany, crossing Czechia and Germany.
- How long is Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline?
- Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is 150 km long.
- How much gas can Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline carry?
- Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline has a design capacity of 27.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline operating?
- Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is operating, having started in 2021.
- Who owns Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline?
- Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is owned by Net4Gas, as recorded in the current tracker release.
More gas pipelines in Czechia
Listed in name order among the 14 pipelines tracked in Czechia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.