LNG Atlas

Gas transmission pipeline · Czechia – Germany

Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline

Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is an operating gas transmission pipeline crossing Czechia, Germany. The tracker lists 1 tracked segment, 150 km long and 27.5 bcm/y of capacity, starting up in 2021. It is owned by Net4Gas.

Length

150 km

Capacity

27.5 bcm/y

20.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1397 mm (55 in)

Route

Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline runs from Czechia – Germany. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Czech Republic
End country
Germany
Countries crossed
Czechia, Germany
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
141 km
GEM pipeline ID
P1698
Start year
2021
Estimated cost (GEM, US dollars)
$589 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNot reported15027.51397 mm2021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline run?
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline runs from Czech Republic to Germany, crossing Czechia and Germany.
How long is Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline?
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is 150 km long.
How much gas can Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline carry?
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline has a design capacity of 27.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline operating?
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is operating, having started in 2021.
Who owns Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline?
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is owned by Net4Gas, as recorded in the current tracker release.

More gas pipelines in Czechia

Listed in name order among the 14 pipelines tracked in Czechia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail