Gas transmission pipeline · Kanai Chhata to Shrirampur
Kanai Chhata-Shrirampur Gas Pipeline
Kanai Chhata-Shrirampur Gas Pipeline is a cancelled gas transmission pipeline in India. The tracker lists 1 tracked segment, 250 km long and 7.01 bcm/y of capacity, starting up in 2023. It runs from Kanai Chhata to Shrirampur. It is owned by H-Energy.
Length
250 km
Capacity
7.01 bcm/y
5.2 Mtpa LNG equivalent
Segments tracked
1
Route
Kanai Chhata-Shrirampur Gas Pipeline runs from Kanai Chhata to Shrirampur. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kanai Chhata
- To
- Shrirampur
- Start country
- India
- End country
- India
- Countries crossed
- India
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 248 km
- GEM pipeline ID
- P2214
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Kanai Chhata → Shrirampur | 250 | 7.01 | — | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Digha FSRU | India | Import | Cancelled | 14.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- H-Energy100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Kanai Chhata-Shrirampur Gas Pipeline run?
- Kanai Chhata-Shrirampur Gas Pipeline runs from Kanai Chhata to Shrirampur, crossing India.
- How long is Kanai Chhata-Shrirampur Gas Pipeline?
- Kanai Chhata-Shrirampur Gas Pipeline is 250 km long.
- How much gas can Kanai Chhata-Shrirampur Gas Pipeline carry?
- Kanai Chhata-Shrirampur Gas Pipeline has a design capacity of 7.01 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Kanai Chhata-Shrirampur Gas Pipeline operating?
- Kanai Chhata-Shrirampur Gas Pipeline is cancelled, with a reported start year of 2023.
- Who owns Kanai Chhata-Shrirampur Gas Pipeline?
- Kanai Chhata-Shrirampur Gas Pipeline is owned by H-Energy, as recorded in the current tracker release.
- Does Kanai Chhata-Shrirampur Gas Pipeline serve an LNG terminal?
- Kanai Chhata-Shrirampur Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.