Gas transmission pipeline · Sherman to Perryville
Gulf Crossing Pipeline
Gulf Crossing Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 568 km long and 17.64 bcm/y of capacity, starting up in 2009. It runs from Sherman to Perryville. It is owned by Boardwalk Pipeline Partners.
Length
568 km
Capacity
17.6 bcm/y
13.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Gulf Crossing Pipeline runs from Sherman to Perryville. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sherman
- To
- Perryville
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 459 km
- GEM pipeline ID
- P0196
- Start year
- 2009
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Sherman → Perryville | 568 | 17.6 | 1067 mm | 2009 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Bay Crossing LNG Terminal | United States | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Loews Corp100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gulf Crossing Pipeline run?
- Gulf Crossing Pipeline runs from Sherman to Perryville, crossing United States.
- How long is Gulf Crossing Pipeline?
- Gulf Crossing Pipeline is 568 km long.
- How much gas can Gulf Crossing Pipeline carry?
- Gulf Crossing Pipeline has a design capacity of 17.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Gulf Crossing Pipeline operating?
- Gulf Crossing Pipeline is operating, having started in 2009.
- Who owns Gulf Crossing Pipeline?
- Gulf Crossing Pipeline is owned by Boardwalk Pipeline Partners, as recorded in the current tracker release.
- Does Gulf Crossing Pipeline serve an LNG terminal?
- Gulf Crossing Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.