Gas transmission pipeline · Coyanosa to Agua Dulce
Gulf Coast Express Pipeline
Gulf Coast Express Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 801 km long and 20.24 bcm/y of capacity, starting up in 2019. It runs from Coyanosa to Agua Dulce. It is owned by Gulf Coast Express Pipeline LLC.
Length
801 km
Capacity
20.2 bcm/y
14.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Gulf Coast Express Pipeline runs from Coyanosa to Agua Dulce. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Coyanosa
- To
- Agua Dulce
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 853 km
- GEM pipeline ID
- P0378
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Main Line | Operating | Coyanosa → Agua Dulce | 801 | 20.2 | 914 mm | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gulf Coast Express Pipeline run?
- Gulf Coast Express Pipeline runs from Coyanosa to Agua Dulce, crossing United States.
- How long is Gulf Coast Express Pipeline?
- Gulf Coast Express Pipeline is 801 km long.
- How much gas can Gulf Coast Express Pipeline carry?
- Gulf Coast Express Pipeline has a design capacity of 20.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Gulf Coast Express Pipeline operating?
- Gulf Coast Express Pipeline is operating, having started in 2019.
- Who owns Gulf Coast Express Pipeline?
- Gulf Coast Express Pipeline is owned by Gulf Coast Express Pipeline LLC, as recorded in the current tracker release.