Gas transmission pipeline · Guaymas to El Oro
Guaymas-El Oro Pipeline
Guaymas-El Oro Pipeline is an idle gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 331 km long and 5.3 bcm/y of capacity, starting up in 2017. It runs from Guaymas to El Oro. It is owned by IEnova.
Length
331 km
Capacity
5.3 bcm/y
3.9 Mtpa LNG equivalent
Segments tracked
1
Route
Guaymas-El Oro Pipeline runs from Guaymas to El Oro. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Guaymas
- To
- El Oro
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 315 km
- GEM pipeline ID
- P1263
- Start year
- 2017
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Idle | Guaymas → El Oro | 331 | 5.3 | — | 2017 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| AMIGO FLNG Terminal | Mexico | Export | Proposed | 0.9 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- IEnova100%
Parent companies
- Sempra Energy100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Guaymas-El Oro Pipeline run?
- Guaymas-El Oro Pipeline runs from Guaymas to El Oro, crossing Mexico.
- How long is Guaymas-El Oro Pipeline?
- Guaymas-El Oro Pipeline is 331 km long.
- How much gas can Guaymas-El Oro Pipeline carry?
- Guaymas-El Oro Pipeline has a design capacity of 5.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Guaymas-El Oro Pipeline operating?
- Guaymas-El Oro Pipeline is idle, with a reported start year of 2017.
- Who owns Guaymas-El Oro Pipeline?
- Guaymas-El Oro Pipeline is owned by IEnova, as recorded in the current tracker release.
- Does Guaymas-El Oro Pipeline serve an LNG terminal?
- Guaymas-El Oro Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.