Gas transmission pipeline · Armenia
Ghazakh-Yerevan Gas Pipeline
Ghazakh-Yerevan Gas Pipeline is an operating gas transmission pipeline in Armenia. The tracker lists 1 tracked segment, 180 km long and 4.7 bcm/y of capacity, starting up in 1960. It is owned by CJSC Gazprom Armenia.
Length
180 km
Capacity
4.7 bcm/y
3.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 12700 mm (500 in)
Route
Ghazakh-Yerevan Gas Pipeline runs from Armenia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Azerbaijan
- End country
- Armenia
- Countries crossed
- Armenia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 123 km
- GEM pipeline ID
- P4267
- Start year
- 1960
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 180 | 4.7 | 12700 mm | 1960 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name Ghazakh-Yerevan Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Ghazakh-Yerevan Gas Pipeline run?
- Ghazakh-Yerevan Gas Pipeline runs from Azerbaijan to Armenia, crossing Armenia.
- How long is Ghazakh-Yerevan Gas Pipeline?
- Ghazakh-Yerevan Gas Pipeline is 180 km long.
- How much gas can Ghazakh-Yerevan Gas Pipeline carry?
- Ghazakh-Yerevan Gas Pipeline has a design capacity of 4.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Ghazakh-Yerevan Gas Pipeline operating?
- Ghazakh-Yerevan Gas Pipeline is operating, having started in 1960.
- Who owns Ghazakh-Yerevan Gas Pipeline?
- Ghazakh-Yerevan Gas Pipeline is owned by CJSC Gazprom Armenia, as recorded in the current tracker release.
More gas pipelines in Armenia
Listed in name order among the 5 pipelines tracked in Armenia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.