Gas transmission pipeline · Gazli to Kagan
Gazli-Kagan Gas Pipeline
Gazli-Kagan Gas Pipeline is an operating gas transmission pipeline in Uzbekistan. The tracker lists 1 tracked segment, 115 km long and 12.78 bcm/y of capacity, starting up in 1973. It runs from Gazli to Kagan.
Length
115 km
Capacity
12.8 bcm/y
9.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 720 mm (28 in)
Route
Gazli-Kagan Gas Pipeline runs from Gazli to Kagan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Gazli
- To
- Kagan
- Start country
- Uzbekistan
- End country
- Uzbekistan
- Countries crossed
- Uzbekistan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 105 km
- GEM pipeline ID
- P2290
- Start year
- 1973
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Segment I, II | Operating | Gazli → Kagan | 115 | 12.8 | 720 mm | 1973 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gazli-Kagan Gas Pipeline run?
- Gazli-Kagan Gas Pipeline runs from Gazli to Kagan, crossing Uzbekistan.
- How long is Gazli-Kagan Gas Pipeline?
- Gazli-Kagan Gas Pipeline is 115 km long.
- How much gas can Gazli-Kagan Gas Pipeline carry?
- Gazli-Kagan Gas Pipeline has a design capacity of 12.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Gazli-Kagan Gas Pipeline operating?
- Gazli-Kagan Gas Pipeline is operating, having started in 1973.
- Who owns Gazli-Kagan Gas Pipeline?
- Ownership of Gazli-Kagan Gas Pipeline is not reported in the current tracker release.