Gas transmission pipeline · Gafsa to Gafsa
Gafsa Phosphates Gas Pipeline
Gafsa Phosphates Gas Pipeline is a proposed gas transmission pipeline in Tunisia. The tracker lists 1 tracked segment, 30 km long, starting up in 2026. It runs from Gafsa to Gafsa.
Length
30 km
Capacity
Not reported
Segments tracked
1
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Gafsa
- To
- Gafsa
- Start country
- Tunisia
- End country
- Tunisia
- Countries crossed
- Tunisia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P7672
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Gafsa → Gafsa | 30 | Not reported | — | 2026 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Gafsa Phosphates Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gafsa Phosphates Gas Pipeline run?
- Gafsa Phosphates Gas Pipeline runs from Gafsa to Gafsa, crossing Tunisia.
- How long is Gafsa Phosphates Gas Pipeline?
- Gafsa Phosphates Gas Pipeline is 30 km long.
- How much gas can Gafsa Phosphates Gas Pipeline carry?
- No design capacity is reported for Gafsa Phosphates Gas Pipeline. That is an absent figure, not a zero.
- Is Gafsa Phosphates Gas Pipeline operating?
- Gafsa Phosphates Gas Pipeline is proposed, with a reported start year of 2026.
- Who owns Gafsa Phosphates Gas Pipeline?
- Ownership of Gafsa Phosphates Gas Pipeline is not reported in the current tracker release.
More gas pipelines in Tunisia
Listed in name order among the 16 pipelines tracked in Tunisia, so projects with the same name sit together. A browse aid, not a claim that they are alike.