Gas transmission pipeline · Rogaland to Lower Saxony
Europipe II Gas Pipeline
Europipe II Gas Pipeline is an operating gas transmission pipeline crossing Norway, Germany. The tracker lists 1 tracked segment, 658 km long and 21 bcm/y of capacity, starting up in 1999. It runs from Rogaland to Lower Saxony. It is owned by Gassled.
Length
658 km
Capacity
21 bcm/y
15.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Europipe II Gas Pipeline runs from Rogaland to Lower Saxony. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Rogaland
- To
- Lower Saxony
- Start country
- Norway
- End country
- Germany
- Countries crossed
- Norway, Germany
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 658 km
- GEM pipeline ID
- P0690
- Start year
- 1999
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Rogaland → Lower Saxony | 658 | 21 | 1067 mm | 1999 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Snurrevarden LNG Terminal | Norway | Export | Operating | 12.9 km | route proximity |
| Risavika LNG Terminal | Norway | Export | Operating | 18.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gassled100%
Parent companies
- Petoro AS46.7%
- Partners Group26.3%
- Hav Energy NCS Gas AS15.6%
- Allianz SE6.4%
- Equinor ASA5%
In the news
Recent headlines that name Europipe II Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Europipe II Gas Pipeline run?
- Europipe II Gas Pipeline runs from Rogaland to Lower Saxony, crossing Norway and Germany.
- How long is Europipe II Gas Pipeline?
- Europipe II Gas Pipeline is 658 km long.
- How much gas can Europipe II Gas Pipeline carry?
- Europipe II Gas Pipeline has a design capacity of 21 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Europipe II Gas Pipeline operating?
- Europipe II Gas Pipeline is operating, having started in 1999.
- Who owns Europipe II Gas Pipeline?
- Europipe II Gas Pipeline is owned by Gassled, as recorded in the current tracker release.
- Does Europipe II Gas Pipeline serve an LNG terminal?
- Europipe II Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Norway
Listed in name order among the 33 pipelines tracked in Norway, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.