Gas transmission pipeline · Slovakia – Hungary – Romania – Bulgaria – Türkiye
Eastring Pipeline
Eastring Pipeline is a proposed gas transmission pipeline crossing Slovakia, Hungary, Romania and 2 more. The tracker lists 1 tracked segment, 1,208 km long and 20 bcm/y of capacity, starting up in 2027. Owners include eustream, Bulgartransgaz, SNTGN Transgaz SA and 1 more.
Length
1,208 km
Capacity
20 bcm/y
14.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1400 mm (55 in)
Route
Eastring Pipeline runs from Slovakia – Hungary – Romania – Bulgaria – Türkiye. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Slovakia
- End country
- Türkiye
- Countries crossed
- Slovakia, Hungary, Romania, Bulgaria, Türkiye
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 1,152 km
- GEM pipeline ID
- P0803
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Not reported | 1,208 | 20 | 1400 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Eastring Pipeline run?
- Eastring Pipeline runs from Slovakia to Türkiye, crossing Slovakia, Hungary, Romania, Bulgaria and 1 other.
- How long is Eastring Pipeline?
- Eastring Pipeline is 1,208 km long.
- How much gas can Eastring Pipeline carry?
- Eastring Pipeline has a design capacity of 20 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Eastring Pipeline operating?
- Eastring Pipeline is proposed, with a reported start year of 2027.
- Who owns Eastring Pipeline?
- Eastring Pipeline is owned by eustream, Bulgartransgaz, MOL Group and 1 other, as recorded in the current tracker release.