LNG Atlas

Gas transmission pipeline · Slovakia – Hungary – Romania – Bulgaria – Türkiye

Eastring Pipeline

Eastring Pipeline is a proposed gas transmission pipeline crossing Slovakia, Hungary, Romania and 2 more. The tracker lists 1 tracked segment, 1,208 km long and 20 bcm/y of capacity, starting up in 2027. Owners include eustream, Bulgartransgaz, SNTGN Transgaz SA and 1 more.

Length

1,208 km

Capacity

20 bcm/y

14.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 35560 mm (1400 in)

Route

Eastring Pipeline runs from Slovakia – Hungary – Romania – Bulgaria – Türkiye. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Slovakia
End country
Türkiye
Countries crossed
Slovakia, Hungary, Romania, Bulgaria, Türkiye
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,152 km
GEM pipeline ID
P0803
Start year
2027
Estimated cost (GEM, US dollars)
$2.83 billion
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedNot reported1,2082035560 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Eastring Pipeline run?
Eastring Pipeline runs from Slovakia to Türkiye, crossing Slovakia, Hungary, Romania, Bulgaria and 1 other.
How long is Eastring Pipeline?
Eastring Pipeline is 1,208 km long.
How much gas can Eastring Pipeline carry?
Eastring Pipeline has a design capacity of 20 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Eastring Pipeline operating?
Eastring Pipeline is proposed, with a reported start year of 2027.
Who owns Eastring Pipeline?
Eastring Pipeline is owned by eustream, Bulgartransgaz, Mitsui O.S.K. Lines and 1 other, as recorded in the current tracker release.

More gas pipelines in Slovakia

Listed in name order among the 10 pipelines tracked in Slovakia, so projects with the same name sit together. A browse aid, not a claim that they are alike.