Gas transmission pipeline · Libya
DP3–DP4–Sabratha Gas Pipeline
DP3–DP4–Sabratha Gas Pipeline is an under construction gas transmission pipeline in Libya. The tracker lists 1 tracked segment, 20 km long.
Length
20 km
Capacity
Not reported
Segments tracked
1
Largest diameter 2642 mm (104 in)
Route
DP3–DP4–Sabratha Gas Pipeline runs from Libya. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Libya
- End country
- Libya
- Countries crossed
- Libya
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 751 km
- GEM pipeline ID
- P7617
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| DP4–Sabratha | Under construction | Not reported | 20 | Not reported | 2642 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name DP3–DP4–Sabratha Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does DP3–DP4–Sabratha Gas Pipeline run?
- DP3–DP4–Sabratha Gas Pipeline is recorded in Libya. Global Energy Monitor reports no start and end points for it.
- How long is DP3–DP4–Sabratha Gas Pipeline?
- DP3–DP4–Sabratha Gas Pipeline is 20 km long.
- How much gas can DP3–DP4–Sabratha Gas Pipeline carry?
- No design capacity is reported for DP3–DP4–Sabratha Gas Pipeline. That is an absent figure, not a zero.
- Is DP3–DP4–Sabratha Gas Pipeline operating?
- DP3–DP4–Sabratha Gas Pipeline is under construction.
- Who owns DP3–DP4–Sabratha Gas Pipeline?
- Ownership of DP3–DP4–Sabratha Gas Pipeline is not reported in the current tracker release.
More gas pipelines in Libya
Listed in name order among the 37 pipelines tracked in Libya, so projects with the same name sit together. A browse aid, not a claim that they are alike.