Gas transmission pipeline · Croatia
Donji Miholjac–Belišće Gas pipeline
Donji Miholjac–Belišće Gas pipeline is an operating gas transmission pipeline in Croatia. The tracker lists 1 tracked segment, 20 km long and 1.05 bcm/y of capacity, starting up in 2020. It is owned by Plinacro Ltd.
Length
20 km
Capacity
1.05 bcm/y
0.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 10160 mm (400 in)
Route
Donji Miholjac–Belišće Gas pipeline runs from Croatia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Croatia
- End country
- Croatia
- Countries crossed
- Croatia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 20 km
- GEM pipeline ID
- P3416
- Start year
- 2020
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 20 | 1.05 | 10160 mm | 2020 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Plinacro Ltd100%
Parent companies
- Plinacro doo100%
In the news
Recent headlines that name Donji Miholjac–Belišće Gas pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Donji Miholjac–Belišće Gas pipeline run?
- Donji Miholjac–Belišće Gas pipeline is recorded in Croatia. Global Energy Monitor reports no start and end points for it.
- How long is Donji Miholjac–Belišće Gas pipeline?
- Donji Miholjac–Belišće Gas pipeline is 20 km long.
- How much gas can Donji Miholjac–Belišće Gas pipeline carry?
- Donji Miholjac–Belišće Gas pipeline has a design capacity of 1.05 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Donji Miholjac–Belišće Gas pipeline operating?
- Donji Miholjac–Belišće Gas pipeline is operating, having started in 2020.
- Who owns Donji Miholjac–Belišće Gas pipeline?
- Donji Miholjac–Belišće Gas pipeline is owned by Plinacro Ltd, as recorded in the current tracker release.
More gas pipelines in Croatia
Listed in name order among the 22 pipelines tracked in Croatia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.