Gas transmission pipeline · San José de Chiquitos to Cuiaba
Cuiabá Pipeline
Cuiabá Pipeline is an operating gas transmission pipeline crossing Bolivia, Brazil. The tracker lists 1 tracked segment, 645 km long and 1.02 bcm/y of capacity, starting up in 2002. It runs from San José de Chiquitos to Cuiaba. It is owned by Âmbar Energia.
Length
645 km
Capacity
1.02 bcm/y
0.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 457 mm (18 in)
Route
Cuiabá Pipeline runs from San José de Chiquitos to Cuiaba. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- San José de Chiquitos
- To
- Cuiaba
- Start country
- Bolivia
- End country
- Brazil
- Countries crossed
- Bolivia, Brazil
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 688 km
- GEM pipeline ID
- P1258
- Start year
- 2002
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | San José de Chiquitos → Cuiaba | 645 | 1.02 | 457 mm | 2002 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Âmbar Energia100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Cuiabá Pipeline run?
- Cuiabá Pipeline runs from San José de Chiquitos to Cuiaba, crossing Bolivia and Brazil.
- How long is Cuiabá Pipeline?
- Cuiabá Pipeline is 645 km long.
- How much gas can Cuiabá Pipeline carry?
- Cuiabá Pipeline has a design capacity of 1.02 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Cuiabá Pipeline operating?
- Cuiabá Pipeline is operating, having started in 2002.
- Who owns Cuiabá Pipeline?
- Cuiabá Pipeline is owned by Âmbar Energia, as recorded in the current tracker release.