Chandeleur Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 346 km long and 3.37 bcm/y of capacity, starting up in 1964. It runs from Louisiana, Mississippi to Mississippi. It is owned by EnLink Midstream.

Length

346 km

Capacity

3.37 bcm/y

2.5 Mtpa LNG equivalent

Segments tracked

1

Route

Chandeleur Gas Pipeline runs from Louisiana, Mississippi to Mississippi. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Louisiana, Mississippi
To
Mississippi
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
149 km
GEM pipeline ID
P0165
Start year
1964
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingLouisiana, Mississippi → Mississippi3463.37—1964GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Gulf LNG TerminalUnited StatesExportOperating8 kmroute proximity
Bienville FSRUUnited StatesImportCancelled11 kmroute proximity
Compass Port LNG TerminalUnited StatesImportCancelled11 kmroute proximity
Casotte Landing LNG TerminalUnited StatesImportCancelled11.1 kmroute proximity
CE FLNG TerminalUnited StatesExportCancelled22.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Chandeleur Gas Pipeline run?
Chandeleur Gas Pipeline runs from Louisiana, Mississippi to Mississippi, crossing United States.
How long is Chandeleur Gas Pipeline?
Chandeleur Gas Pipeline is 346 km long.
How much gas can Chandeleur Gas Pipeline carry?
Chandeleur Gas Pipeline has a design capacity of 3.37 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Chandeleur Gas Pipeline operating?
Chandeleur Gas Pipeline is operating, having started in 1964.
Who owns Chandeleur Gas Pipeline?
Chandeleur Gas Pipeline is owned by EnLink Midstream, as recorded in the current tracker release.
Does Chandeleur Gas Pipeline serve an LNG terminal?
Chandeleur Gas Pipeline passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in United States

Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail