Gas transmission pipeline · Ichilo to Carrasco
Carrasco-Yapacaní Gas Pipeline
Carrasco-Yapacaní Gas Pipeline is an operating gas transmission pipeline in Bolivia. The tracker lists 1 tracked segment, 30 km long and 0.31 bcm/y of capacity, starting up in 2020. It runs from Ichilo to Carrasco. It is owned by YPFB Transporte.
Length
30 km
Capacity
0.31 bcm/y
0.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Carrasco-Yapacaní Gas Pipeline runs from Ichilo to Carrasco. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ichilo
- To
- Carrasco
- Start country
- Bolivia
- End country
- Bolivia
- Countries crossed
- Bolivia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 72 km
- GEM pipeline ID
- P3213
- Start year
- 2020
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Extension | Operating | Ichilo → Carrasco | 30 | 0.31 | 406 mm | 2020 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- YPFB Transporte100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Carrasco-Yapacaní Gas Pipeline run?
- Carrasco-Yapacaní Gas Pipeline runs from Ichilo to Carrasco, crossing Bolivia.
- How long is Carrasco-Yapacaní Gas Pipeline?
- Carrasco-Yapacaní Gas Pipeline is 30 km long.
- How much gas can Carrasco-Yapacaní Gas Pipeline carry?
- Carrasco-Yapacaní Gas Pipeline has a design capacity of 0.31 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Carrasco-Yapacaní Gas Pipeline operating?
- Carrasco-Yapacaní Gas Pipeline is operating, having started in 2020.
- Who owns Carrasco-Yapacaní Gas Pipeline?
- Carrasco-Yapacaní Gas Pipeline is owned by YPFB Transporte, as recorded in the current tracker release.