Gas transmission pipeline · Cuzco to Lima
Camisea Gas Pipeline
Camisea Gas Pipeline is an operating gas transmission pipeline in Peru. The tracker lists 1 tracked segment, 730 km long and 15.74 bcm/y of capacity, starting up in 2004. It runs from Cuzco to Lima. It is owned by CPPIB (Canada Pension Plan Investment Board), Enagás SA and Sonatrach SpA.
Length
730 km
Capacity
15.7 bcm/y
11.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 457 mm (18 in)
Route
Camisea Gas Pipeline runs from Cuzco to Lima. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Cuzco
- To
- Lima
- Start country
- Peru
- End country
- Peru
- Countries crossed
- Peru
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 714 km
- GEM pipeline ID
- P1290
- Start year
- 2004
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Cuzco → Lima | 730 | 15.7 | 457 mm | 2004 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Peru LNG Terminal | Peru | Export | Operating | 1.9 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- CPPIB (Canada Pension Plan Investment Board)49.87%
- Enagás SA28.95%
- Sonatrach SpA21.18%
Parent companies
- Canada Pension Plan Investment Board49.87%
- Enagás SA28.95%
- Sonatrach SpA21.18%
In the news
Recent headlines that name Camisea Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Camisea Gas Pipeline run?
- Camisea Gas Pipeline runs from Cuzco to Lima, crossing Peru.
- How long is Camisea Gas Pipeline?
- Camisea Gas Pipeline is 730 km long.
- How much gas can Camisea Gas Pipeline carry?
- Camisea Gas Pipeline has a design capacity of 15.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Camisea Gas Pipeline operating?
- Camisea Gas Pipeline is operating, having started in 2004.
- Who owns Camisea Gas Pipeline?
- Camisea Gas Pipeline is owned by CPPIB (Canada Pension Plan Investment Board), Enagás SA and Sonatrach SpA, as recorded in the current tracker release.
- Does Camisea Gas Pipeline serve an LNG terminal?
- Camisea Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Peru
Listed in name order among the 6 pipelines tracked in Peru, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.