Gas transmission pipeline · Uzbekistan – Kyrgyzstan – Kazakhstan

Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline

Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline is an operating gas transmission pipeline crossing Uzbekistan, Kyrgyzstan, Kazakhstan. The tracker lists 1 tracked segment, 1,585 km long and 12 bcm/y of capacity, starting up in 1971. It is owned by Uztransgaz, QazaqGaz and Gazprom Kyrgyzstan.

Length

1,585 km

Capacity

12 bcm/y

8.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 17780 mm (700 in)

Route

Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline runs from Uzbekistan – Kyrgyzstan – Kazakhstan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Uzbekistan
End country
Kazakhstan
Countries crossed
Uzbekistan, Kyrgyzstan, Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,268 km
GEM pipeline ID
P0739
Start year
1971
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IOperatingNot reported1,5851217780 mm1971GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline run?
Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline runs from Uzbekistan to Kazakhstan, crossing Uzbekistan, Kyrgyzstan and Kazakhstan.
How long is Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline?
Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline is 1,585 km long.
How much gas can Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline carry?
Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline has a design capacity of 12 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline operating?
Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline is operating, having started in 1971.
Who owns Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline?
Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline is owned by Gazprom Kyrgyzstan, QazaqGaz and Uztransgaz, as recorded in the current tracker release.

More gas pipelines in Uzbekistan

Listed in name order among the 21 pipelines tracked in Uzbekistan, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail