LNG Atlas

Gas transmission pipeline · Amur region to Khabarovsk Territory

Belogorsk-Khabarovsk Gas Pipeline

Belogorsk-Khabarovsk Gas Pipeline is an under construction gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 828 km long and 28 bcm/y of capacity, starting up in 2027. It runs from Amur region to Khabarovsk Territory. It is owned by Gazprom PJSC.

Length

828 km

Capacity

28 bcm/y

20.6 Mtpa LNG equivalent

Segments tracked

1

Route

Belogorsk-Khabarovsk Gas Pipeline runs from Amur region to Khabarovsk Territory. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Amur region
To
Khabarovsk Territory
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
760 km
GEM pipeline ID
P5521
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionAmur region → Khabarovsk Territory82828—2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Belogorsk-Khabarovsk Gas Pipeline run?
Belogorsk-Khabarovsk Gas Pipeline runs from Amur region to Khabarovsk Territory, crossing Russia.
How long is Belogorsk-Khabarovsk Gas Pipeline?
Belogorsk-Khabarovsk Gas Pipeline is 828 km long.
How much gas can Belogorsk-Khabarovsk Gas Pipeline carry?
Belogorsk-Khabarovsk Gas Pipeline has a design capacity of 28 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Belogorsk-Khabarovsk Gas Pipeline operating?
Belogorsk-Khabarovsk Gas Pipeline is under construction, with a reported start year of 2027.
Who owns Belogorsk-Khabarovsk Gas Pipeline?
Belogorsk-Khabarovsk Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.

More gas pipelines in Russia

Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail