LNG Atlas

Gas transmission pipeline · Mangystau Region to Turkistan Region

Beineu-Bozoy-Shymkent Gas Pipeline

Beineu-Bozoy-Shymkent Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 0 km long and 5 bcm/y of capacity, starting up in 2029. It runs from Mangystau Region to Turkistan Region. It is owned by QazaqGaz and UCC Holding.

Length

0 km

Capacity

5 bcm/y

3.7 Mtpa LNG equivalent

Segments tracked

1

Route

Beineu-Bozoy-Shymkent Gas Pipeline runs from Mangystau Region to Turkistan Region. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Mangystau Region
To
Turkistan Region
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
2,851 km
GEM pipeline ID
P6712
Start year
2029
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
III (Capacity expansion)ProposedMangystau Region → Turkistan Region05—2029GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Beineu-Bozoy-Shymkent Gas Pipeline run?
Beineu-Bozoy-Shymkent Gas Pipeline runs from Mangystau Region to Turkistan Region, crossing Kazakhstan.
How long is Beineu-Bozoy-Shymkent Gas Pipeline?
No length is reported for Beineu-Bozoy-Shymkent Gas Pipeline and no route geometry is available to measure one from.
How much gas can Beineu-Bozoy-Shymkent Gas Pipeline carry?
Beineu-Bozoy-Shymkent Gas Pipeline has a design capacity of 5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Beineu-Bozoy-Shymkent Gas Pipeline operating?
Beineu-Bozoy-Shymkent Gas Pipeline is proposed, with a reported start year of 2029.
Who owns Beineu-Bozoy-Shymkent Gas Pipeline?
Beineu-Bozoy-Shymkent Gas Pipeline is owned by QazaqGaz and UCC Holding, as recorded in the current tracker release.

More gas pipelines in Kazakhstan

Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.