Gas transmission pipeline · Mangystau Region to Turkistan Region
Beineu-Bozoy-Shymkent Gas Pipeline
Beineu-Bozoy-Shymkent Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 0 km long and 5 bcm/y of capacity, starting up in 2029. It runs from Mangystau Region to Turkistan Region. It is owned by QazaqGaz and UCC Holding.
Length
0 km
Capacity
5 bcm/y
3.7 Mtpa LNG equivalent
Segments tracked
1
Route
Beineu-Bozoy-Shymkent Gas Pipeline runs from Mangystau Region to Turkistan Region. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mangystau Region
- To
- Turkistan Region
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 2,851 km
- GEM pipeline ID
- P6712
- Start year
- 2029
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| III (Capacity expansion) | Proposed | Mangystau Region → Turkistan Region | 0 | 5 | — | 2029 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Beineu-Bozoy-Shymkent Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Beineu-Bozoy-Shymkent Gas Pipeline run?
- Beineu-Bozoy-Shymkent Gas Pipeline runs from Mangystau Region to Turkistan Region, crossing Kazakhstan.
- How long is Beineu-Bozoy-Shymkent Gas Pipeline?
- No length is reported for Beineu-Bozoy-Shymkent Gas Pipeline and no route geometry is available to measure one from.
- How much gas can Beineu-Bozoy-Shymkent Gas Pipeline carry?
- Beineu-Bozoy-Shymkent Gas Pipeline has a design capacity of 5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Beineu-Bozoy-Shymkent Gas Pipeline operating?
- Beineu-Bozoy-Shymkent Gas Pipeline is proposed, with a reported start year of 2029.
- Who owns Beineu-Bozoy-Shymkent Gas Pipeline?
- Beineu-Bozoy-Shymkent Gas Pipeline is owned by QazaqGaz and UCC Holding, as recorded in the current tracker release.
More gas pipelines in Kazakhstan
Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Bukhara-Ural Gas PipelineAktobe Region to Aktobe Region · 165 km
- Bukhara-Ural Gas PipelineAktobe Region to Aktobe Region · 158 km
- Bukhara-Ural Gas PipelineAktobe Region to Aktobe Region · 158 km
- Amangeldy-KS5 Gas PipelineKostanay to Jambyl · 193 km
- Beineu-Bozoy-Shymkent Gas PipelineMangystau Region to Turkistan Region · 1,449 km
- Beineu-Bozoy-Shymkent Gas PipelineMangystau Region to Turkistan Region · 1,449 km