Gas transmission pipeline · Beglej to Kalugerovo
Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline
Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline is an operating gas transmission pipeline in Bulgaria. The tracker lists 1 tracked segment, 58 km long, starting up in 2022. It runs from Beglej to Kalugerovo. It is owned by Bulgartransgaz.
Length
58 km
Capacity
Not reported
Segments tracked
1
Largest diameter 699 mm (28 in)
Route
Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline runs from Beglej to Kalugerovo. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Beglej
- To
- Kalugerovo
- Start country
- Bulgaria
- End country
- Bulgaria
- Countries crossed
- Bulgaria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 57 km
- GEM pipeline ID
- P2084
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Replacement Line | Operating | Beglej → Kalugerovo | 58 | Not reported | 699 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Bulgartransgaz100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline run?
- Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline runs from Beglej to Kalugerovo, crossing Bulgaria.
- How long is Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline?
- Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline is 58 km long.
- How much gas can Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline carry?
- No design capacity is reported for Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline. That is an absent figure, not a zero.
- Is Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline operating?
- Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline is operating, having started in 2022.
- Who owns Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline?
- Beglej-Dermantsi-Batultsi-Kalugerovo Pipeline is owned by Bulgartransgaz, as recorded in the current tracker release.