LNG Chain

Gas transmission pipeline · Rostock to Trelleborg

Baltic Gas Interconnector

Baltic Gas Interconnector is a cancelled gas transmission pipeline crossing Germany, Sweden, Denmark. The tracker lists 1 tracked segment, 200 km long and 3 bcm/y of capacity. It runs from Rostock to Trelleborg. Owners include Ørsted AS, HMN Naturgas I/S, EnBW and 4 more.

Length

200 km

Capacity

3 bcm/y

2.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 810 mm (32 in)

Route

Baltic Gas Interconnector runs from Rostock to Trelleborg. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Rostock
To
Trelleborg
Start country
Germany
End country
Denmark
Countries crossed
Germany, Sweden, Denmark
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
178 km
GEM pipeline ID
P0683
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledRostock → Trelleborg2003810 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Rostock LNG TerminalGermanyImportProposed1.7 kmroute proximity
Polish Baltic Sea Coast FSRUPolandImportUnder constructionname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Baltic Gas Interconnector run?
Baltic Gas Interconnector runs from Rostock to Trelleborg, crossing Germany, Sweden and Denmark.
How long is Baltic Gas Interconnector?
Baltic Gas Interconnector is 200 km long.
How much gas can Baltic Gas Interconnector carry?
Baltic Gas Interconnector has a design capacity of 3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Baltic Gas Interconnector operating?
Baltic Gas Interconnector is cancelled.
Who owns Baltic Gas Interconnector?
Baltic Gas Interconnector is owned by Ørsted AS, E.ON SE, EnBW and 4 others, as recorded in the current tracker release.
Does Baltic Gas Interconnector serve an LNG terminal?
Baltic Gas Interconnector passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.