LNG Atlas

Gas transmission pipeline · Lower Saxony to Lower Saxony

Achim-Elbe Sud Gas Pipeline

Achim-Elbe Sud Gas Pipeline is a proposed gas transmission pipeline in Germany. The tracker lists 1 tracked segment, 86 km long, starting up in 2027. It runs from Lower Saxony to Lower Saxony. It is owned by Gasunie Deutschland Transport Services GmbH.

Length

86 km

Capacity

Not reported

Segments tracked

1

Largest diameter 35560 mm (1400 in)

Route

Achim-Elbe Sud Gas Pipeline runs from Lower Saxony to Lower Saxony. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Lower Saxony
To
Lower Saxony
Start country
Germany
End country
Germany
Countries crossed
Germany
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
86 km
GEM pipeline ID
P5494
Start year
2027
Estimated cost (GEM, US dollars)
$807 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedLower Saxony → Lower Saxony86Not reported35560 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Stade FSRUGermanyImportUnder construction8.4 kmroute proximity
Stade LNG TerminalGermanyImportUnder construction8.5 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Achim-Elbe Sud Gas Pipeline run?
Achim-Elbe Sud Gas Pipeline runs from Lower Saxony to Lower Saxony, crossing Germany.
How long is Achim-Elbe Sud Gas Pipeline?
Achim-Elbe Sud Gas Pipeline is 86 km long.
How much gas can Achim-Elbe Sud Gas Pipeline carry?
No design capacity is reported for Achim-Elbe Sud Gas Pipeline. That is an absent figure, not a zero.
Is Achim-Elbe Sud Gas Pipeline operating?
Achim-Elbe Sud Gas Pipeline is proposed, with a reported start year of 2027.
Who owns Achim-Elbe Sud Gas Pipeline?
Achim-Elbe Sud Gas Pipeline is owned by Gasunie Deutschland Transport Services GmbH, as recorded in the current tracker release.
Does Achim-Elbe Sud Gas Pipeline serve an LNG terminal?
Achim-Elbe Sud Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Germany

Listed in name order among the 90 pipelines tracked in Germany, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail