LNG Chain

Gas transmission pipeline · Bangladesh

Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline

Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline is an under construction gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 50 km long, starting up in 2024. It is owned by Gas Transmission Co Ltd (GTCL).

Length

50 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bakhrabad
To
Not reported
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
25 km
GEM pipeline ID
P3920
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionBakhrabad → ?50Not reported1067 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline run?
Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
How long is Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline?
Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline is 50 km long.
How much gas can Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline carry?
No design capacity is reported for Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline. That is an absent figure, not a zero.
Is Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline operating?
Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline is under construction, with a reported start year of 2024.
Who owns Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline?
Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.