Gas transmission pipeline · Atuabo to Takoradi Thermal Power Station
Atuabo–Takoradi Gas Pipeline
Atuabo–Takoradi Gas Pipeline is an operating gas transmission pipeline in Ghana. The tracker lists 1 tracked segment, 186 km long and 1.5 bcm/y of capacity, starting up in 2014. It runs from Atuabo to Takoradi Thermal Power Station. It is owned by Ghana National Gas Co.
Length
186 km
Capacity
1.5 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Atuabo–Takoradi Gas Pipeline runs from Atuabo to Takoradi Thermal Power Station. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Atuabo
- To
- Takoradi Thermal Power Station
- Start country
- Ghana
- End country
- Ghana
- Countries crossed
- Ghana
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 170 km
- GEM pipeline ID
- P2206
- Start year
- 2014
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Atuabo → Takoradi Thermal Power Station | 186 | 1.5 | 508 mm | 2014 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Atuabo–Takoradi Gas Pipeline run?
- Atuabo–Takoradi Gas Pipeline runs from Atuabo to Takoradi Thermal Power Station, crossing Ghana.
- How long is Atuabo–Takoradi Gas Pipeline?
- Atuabo–Takoradi Gas Pipeline is 186 km long.
- How much gas can Atuabo–Takoradi Gas Pipeline carry?
- Atuabo–Takoradi Gas Pipeline has a design capacity of 1.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Atuabo–Takoradi Gas Pipeline operating?
- Atuabo–Takoradi Gas Pipeline is operating, having started in 2014.
- Who owns Atuabo–Takoradi Gas Pipeline?
- Atuabo–Takoradi Gas Pipeline is owned by Ghana National Gas Co, as recorded in the current tracker release.