Gas transmission pipeline · Argentina – Chile
Atacama Gas Pipeline
Atacama Gas Pipeline is an operating gas transmission pipeline crossing Argentina, Chile. The tracker lists 1 tracked segment, 1,167 km long and 1.97 bcm/y of capacity, starting up in 1999. It is owned by Enel Generación Chile SA and other.
Length
1,167 km
Capacity
1.97 bcm/y
1.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 305 mm (12 in)
Route
Atacama Gas Pipeline runs from Argentina – Chile. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Argentina
- End country
- Chile
- Countries crossed
- Argentina, Chile
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,168 km
- GEM pipeline ID
- P1261
- Start year
- 1999
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 1,167 | 1.97 | 305 mm | 1999 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Gas Atacama FLNG Terminal | Chile | Import | Cancelled | 3.2 km | route proximity |
| Mejillones LNG Terminal | Chile | Import | Operating | 6.5 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Enel Generación Chile SA97.4%
- other2.6%
Parent companies
In the news
Recent headlines that name Atacama Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Atacama Gas Pipeline run?
- Atacama Gas Pipeline runs from Argentina to Chile, crossing Argentina and Chile.
- How long is Atacama Gas Pipeline?
- Atacama Gas Pipeline is 1,167 km long.
- How much gas can Atacama Gas Pipeline carry?
- Atacama Gas Pipeline has a design capacity of 1.97 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Atacama Gas Pipeline operating?
- Atacama Gas Pipeline is operating, having started in 1999.
- Who owns Atacama Gas Pipeline?
- Atacama Gas Pipeline is owned by Enel Generación Chile SA and other, as recorded in the current tracker release.
- Does Atacama Gas Pipeline serve an LNG terminal?
- Atacama Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Argentina
Listed in name order among the 50 pipelines tracked in Argentina, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Bioceánico Gas PipelineSalta to Mato Grosso do Sul · 1,050 km
- Bioceánico Gas PipelineSalta to Mato Grosso do Sul · 1,050 km
- Centro Oeste Gas PipelineNeuquén to Santa Fe · 1,121 km
- Anillo Gran Buenos Aires Gas PipelineBuenos Aires to Buenos Aires · 29 km
- Argentina LNG Gas PipelineNeuquén to Río Negro · 640 km
- Argentina LNG Gas PipelineNeuquén to Río Negro · 470 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.