Ajdovščina – Lucija Gas Pipeline

Ajdovščina – Lucija Gas Pipeline is an under construction gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 46 km long, starting up in 2025. It runs from Adjovscina to Lucija. It is owned by Plinovodi doo.

Length

46 km

Capacity

Not reported

Segments tracked

1

Largest diameter 400 mm (16 in)

Route

Ajdovščina – Lucija Gas Pipeline runs from Adjovscina to Lucija. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Adjovscina
To
Lucija
Start country
Slovenia
End country
Slovenia
Countries crossed
Slovenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
47 km
GEM pipeline ID
P4327
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionAdjovscina → Lucija46Not reported400 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Zaule LNG TerminalItalyImportCancelled5.7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Ajdovščina – Lucija Gas Pipeline run?
Ajdovščina – Lucija Gas Pipeline runs from Adjovscina to Lucija, crossing Slovenia.
How long is Ajdovščina – Lucija Gas Pipeline?
Ajdovščina – Lucija Gas Pipeline is 46 km long.
How much gas can Ajdovščina – Lucija Gas Pipeline carry?
No design capacity is reported for Ajdovščina – Lucija Gas Pipeline. That is an absent figure, not a zero.
Is Ajdovščina – Lucija Gas Pipeline operating?
Ajdovščina – Lucija Gas Pipeline is under construction, with a reported start year of 2025.
Who owns Ajdovščina – Lucija Gas Pipeline?
Ajdovščina – Lucija Gas Pipeline is owned by Plinovodi doo, as recorded in the current tracker release.
Does Ajdovščina – Lucija Gas Pipeline serve an LNG terminal?
Ajdovščina – Lucija Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.