Gas transmission pipeline · Batna to Batna
Aïn Djasser-Batna Gas Pipeline
Aïn Djasser-Batna Gas Pipeline is an operating gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 58 km long, starting up in 1980. It runs from Batna to Batna. It is owned by Sonatrach SpA.
Length
58 km
Capacity
Not reported
Segments tracked
1
Largest diameter 152 mm (6.0 in)
Route
Aïn Djasser-Batna Gas Pipeline runs from Batna to Batna. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Batna
- To
- Batna
- Start country
- Algeria
- End country
- Algeria
- Countries crossed
- Algeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 79 km
- GEM pipeline ID
- P6614
- Start year
- 1980
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Pipeline 1 | Operating | Batna → Batna | 58 | Not reported | 152 mm | 1980 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Khor Al-Zubair FSRU | Iraq | Import | Proposed | 0.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Sonatrach SpA100%
Parent companies
- Sonatrach SpA100%
In the news
Recent headlines that name Aïn Djasser-Batna Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Aïn Djasser-Batna Gas Pipeline run?
- Aïn Djasser-Batna Gas Pipeline runs from Batna to Batna, crossing Algeria.
- How long is Aïn Djasser-Batna Gas Pipeline?
- Aïn Djasser-Batna Gas Pipeline is 58 km long.
- How much gas can Aïn Djasser-Batna Gas Pipeline carry?
- No design capacity is reported for Aïn Djasser-Batna Gas Pipeline. That is an absent figure, not a zero.
- Is Aïn Djasser-Batna Gas Pipeline operating?
- Aïn Djasser-Batna Gas Pipeline is operating, having started in 1980.
- Who owns Aïn Djasser-Batna Gas Pipeline?
- Aïn Djasser-Batna Gas Pipeline is owned by Sonatrach SpA, as recorded in the current tracker release.
- Does Aïn Djasser-Batna Gas Pipeline serve an LNG terminal?
- Aïn Djasser-Batna Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Algeria
Listed in name order among the 125 pipelines tracked in Algeria, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Aïn Djasser-Batna Gas PipelineBatna to Batna · 65 km
- Aïn El Hadjel-M'Sila-Magra Gas PipelineM'Sila to M'Sila · 65 km
- Aïn El Ibel Gas PipelineDjelfa to Djelfa · 30 km
- Zmalet El Emir AEK Gas PipelineTiaret to Tiaret · 32 km
- Ain Ben Khelil Gas PipelineNaâma to Naâma · 44 km
- Aïn Bya-Bir El Djir Gas PipelineOran to Oran Province · 29 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.