Gas transmission pipeline · Matruh to Giza
Abu Gharadig–Dahshour (1) Gas Pipeline
Abu Gharadig–Dahshour (1) Gas Pipeline is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 290 km long and 1.23 bcm/y of capacity. It runs from Matruh to Giza.
Length
290 km
Capacity
1.23 bcm/y
0.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Abu Gharadig–Dahshour (1) Gas Pipeline runs from Matruh to Giza. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Matruh
- To
- Giza
- Start country
- Egypt
- End country
- Egypt
- Countries crossed
- Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 295 km
- GEM pipeline ID
- P3939
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Matruh → Giza | 290 | 1.23 | 610 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Abu Gharadig–Dahshour (1) Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Abu Gharadig–Dahshour (1) Gas Pipeline run?
- Abu Gharadig–Dahshour (1) Gas Pipeline runs from Matruh to Giza, crossing Egypt.
- How long is Abu Gharadig–Dahshour (1) Gas Pipeline?
- Abu Gharadig–Dahshour (1) Gas Pipeline is 290 km long.
- How much gas can Abu Gharadig–Dahshour (1) Gas Pipeline carry?
- Abu Gharadig–Dahshour (1) Gas Pipeline has a design capacity of 1.23 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Abu Gharadig–Dahshour (1) Gas Pipeline operating?
- Abu Gharadig–Dahshour (1) Gas Pipeline is operating.
- Who owns Abu Gharadig–Dahshour (1) Gas Pipeline?
- Ownership of Abu Gharadig–Dahshour (1) Gas Pipeline is not reported in the current tracker release.
More gas pipelines in Egypt
Listed in name order among the 52 pipelines tracked in Egypt, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Abu Sennan Spur Gas Pipeline45 km
- Al Gamil–Damietta Gas PipelinePort Said to Damietta · 50 km
- Amriya–El Alamein Gas PipelineAlexandria to Matruh · 130 km
- South Valley Gas PipelineSohag to Aswan · 390 km
- Zohr–Al Gamil PipelinesMediterranean Sea off shore to Port Said · 216 km
- Zohr–Al Gamil PipelinesMediterranean Sea off shore to Port Said · 210 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.