Gas transmission pipeline · Bangladesh

2nd Bangabandhu Railway Bridge Gas Transmission Pipeline

2nd Bangabandhu Railway Bridge Gas Transmission Pipeline is an under construction gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 10 km long, starting up in 2025. It is owned by Gas Transmission Co Ltd (GTCL).

Length

10 km

Capacity

Not reported

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

2nd Bangabandhu Railway Bridge Gas Transmission Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
6.1 km
GEM pipeline ID
P1571
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionNot reported10Not reported914 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does 2nd Bangabandhu Railway Bridge Gas Transmission Pipeline run?
2nd Bangabandhu Railway Bridge Gas Transmission Pipeline is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
How long is 2nd Bangabandhu Railway Bridge Gas Transmission Pipeline?
2nd Bangabandhu Railway Bridge Gas Transmission Pipeline is 10 km long.
How much gas can 2nd Bangabandhu Railway Bridge Gas Transmission Pipeline carry?
No design capacity is reported for 2nd Bangabandhu Railway Bridge Gas Transmission Pipeline. That is an absent figure, not a zero.
Is 2nd Bangabandhu Railway Bridge Gas Transmission Pipeline operating?
2nd Bangabandhu Railway Bridge Gas Transmission Pipeline is under construction, with a reported start year of 2025.
Who owns 2nd Bangabandhu Railway Bridge Gas Transmission Pipeline?
2nd Bangabandhu Railway Bridge Gas Transmission Pipeline is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.

More gas pipelines in Bangladesh

Listed in name order among the 61 pipelines tracked in Bangladesh, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail