Import terminal · Singapore
SLNG 2 LNG Terminal
SLNG 2 LNG Terminal is a proposed LNG import terminal (floating) in Singapore. The tracker lists 1 tracked unit with 5 Mtpa proposed. It is owned by Singapore LNG Corp.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
5 Mtpa
6.8 bcm/y · 1 unit
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Proposed | 5 | 6.8 | — | 2021 | Not reported | Singapore LNG Corp [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 1 | 5 | 6.8 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Parent companies
Location
SLNG 2 LNG Terminal at 1.2003° N, 103.6728° E, with 2 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 1.2003° N, 103.6728° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| West Natuna Transportation System Gas Pipeline | Operating | 640 km | 3.4 bcm/y | 0.1 km | route proximity |
| Gresik-Batam-Singapore Gas Pipeline | Operating | 468 km | 4.75 bcm/y | 13.1 km | route proximity |
In the news
Recent headlines that name SLNG 2 LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is SLNG 2 LNG Terminal?
- SLNG 2 LNG Terminal is an LNG import terminal in Singapore. It is made up of 1 tracked train or phase.
- Is SLNG 2 LNG Terminal operating?
- SLNG 2 LNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
- How much LNG can SLNG 2 LNG Terminal handle?
- SLNG 2 LNG Terminal has 5 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns SLNG 2 LNG Terminal?
- SLNG 2 LNG Terminal is owned by Singapore LNG Corp. Shares are as recorded in the current tracker release.
- What pipelines connect to SLNG 2 LNG Terminal?
- 2 tracked gas pipelines pass within 25 km of SLNG 2 LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.