Import terminal · Ceará, Brazil
Pecém FSRU
Pecém FSRU is a proposed LNG import terminal (floating storage and regasification unit (FSRU)) in Ceará, Brazil. The tracker lists 2 tracked units with 5.64 Mtpa proposed, the earliest starting in 2008. Ownership is not reported.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
5.64 Mtpa
7.67 bcm/y · 1 unit
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Petrobras Terminal | Retired | 3.8 | 5.17 | 2008 | — | Not reported | Not reported |
| Unit Eneva/Ceiba Terminal | Proposed | 5.64 | 7.67 | — | — | Not reported | Not reported |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Operators
Location
Pecém FSRU at 3.5320° S, 38.7972° W, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 3.5320° S, 38.7972° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| GASFOR Pipeline | Operating | 383 km | 0.74 bcm/y | 8 km | route proximity |
| Santo Antônio dos Lopes-Caucaia Gas Pipeline | Proposed | 684 km | 2.92 bcm/y | 18 km | route proximity |
| GASFOR Pipeline | Operating | 83 km | 2.19 bcm/y | 19.6 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Panama Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Pecém FSRU?
- Pecém FSRU is an LNG import terminal in Ceará, Brazil. It is made up of 2 tracked trains and phases.
- Is Pecém FSRU operating?
- Pecém FSRU is proposed, with a first tracked start year of 2008. Nothing here should be read as a forecast that it will be built.
- How much LNG can Pecém FSRU handle?
- Pecém FSRU has 5.64 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns Pecém FSRU?
- Ownership of Pecém FSRU is not reported in the current tracker release. It is operated by Energos, which is a different thing: the operator runs the facility and need not hold any share of it.
- Which maritime chokepoints do cargoes from Pecém FSRU pass?
- Cargoes from Pecém FSRU would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Pecém FSRU?
- 3 tracked gas pipelines pass within 25 km of Pecém FSRU. Proximity is not proof of a physical connection; each match is listed with its distance.