Gas transmission pipeline · Upper Austria to Upper Austria
West Austria Gas Pipeline
West Austria Gas Pipeline is a proposed gas transmission pipeline in Austria. The tracker lists 1 tracked segment, 40 km long and 2.5 bcm/y of capacity, starting up in 2027. It runs from Upper Austria to Upper Austria.
Length
40 km
Capacity
2.5 bcm/y
1.8 Mtpa LNG equivalent
Segments tracked
1
Route
West Austria Gas Pipeline runs from Upper Austria to Upper Austria. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Upper Austria
- To
- Upper Austria
- Start country
- Austria
- End country
- Austria
- Countries crossed
- Austria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 38 km
- GEM pipeline ID
- P7670
- Start year
- 2027
- Estimated cost (GEM, US dollars)
- $191 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| WAG Loop 1 | Proposed | Upper Austria → Upper Austria | 40 | 2.5 | — | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name West Austria Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does West Austria Gas Pipeline run?
- West Austria Gas Pipeline runs from Upper Austria to Upper Austria, crossing Austria.
- How long is West Austria Gas Pipeline?
- West Austria Gas Pipeline is 40 km long.
- How much gas can West Austria Gas Pipeline carry?
- West Austria Gas Pipeline has a design capacity of 2.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is West Austria Gas Pipeline operating?
- West Austria Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns West Austria Gas Pipeline?
- Ownership of West Austria Gas Pipeline is not reported in the current tracker release.
More gas pipelines in Austria
Listed in name order among the 17 pipelines tracked in Austria, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Auerstal-Kronstorf Gas Pipeline185 km
- Austria–Slovenia Interconnector (SOL) Gas Pipeline28 km
- Austria–Slovenia Interconnector (SOL) Gas Pipeline28 km
- Trans-Austria Gas PipelineLower Austria to Carinthia · 380 km
- West Austria Gas PipelineLower Austria to Upper Austria · 245 km
- West Austria Gas PipelineLower Austria to Upper Austria · 140 km