Gas transmission pipeline · Volodino to Krasnoyarsk
Volodino-Krasnoyarsk Gas Pipeline
Volodino-Krasnoyarsk Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 700 km long and 28.5 bcm/y of capacity, starting up in 2028. It runs from Volodino to Krasnoyarsk. It is owned by Sonatrach SpA.
Length
700 km
Capacity
28.5 bcm/y
21.0 Mtpa LNG equivalent
Segments tracked
1
Route
Volodino-Krasnoyarsk Gas Pipeline runs from Volodino to Krasnoyarsk. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Volodino
- To
- Krasnoyarsk
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 562 km
- GEM pipeline ID
- P6535
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Volodino → Krasnoyarsk | 700 | 28.5 | — | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Sonatrach SpA100%
Parent companies
- Sonatrach SpA100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Volodino-Krasnoyarsk Gas Pipeline run?
- Volodino-Krasnoyarsk Gas Pipeline runs from Volodino to Krasnoyarsk, crossing Russia.
- How long is Volodino-Krasnoyarsk Gas Pipeline?
- Volodino-Krasnoyarsk Gas Pipeline is 700 km long.
- How much gas can Volodino-Krasnoyarsk Gas Pipeline carry?
- Volodino-Krasnoyarsk Gas Pipeline has a design capacity of 28.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Volodino-Krasnoyarsk Gas Pipeline operating?
- Volodino-Krasnoyarsk Gas Pipeline is proposed, with a reported start year of 2028.
- Who owns Volodino-Krasnoyarsk Gas Pipeline?
- Volodino-Krasnoyarsk Gas Pipeline is owned by Sonatrach SpA, as recorded in the current tracker release.