Gas transmission pipeline · Central Java to West Java
Tegalgede-Muara Tawar Gas Pipeline
Tegalgede-Muara Tawar Gas Pipeline is a cancelled gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 50 km long, starting up in 2021. It runs from Central Java to West Java.
Length
50 km
Capacity
Not reported
Segments tracked
1
Route
Tegalgede-Muara Tawar Gas Pipeline runs from Central Java to West Java. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Central Java
- To
- West Java
- Start country
- Indonesia
- End country
- Indonesia
- Countries crossed
- Indonesia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 35 km
- GEM pipeline ID
- P0985
- Start year
- 2021
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Central Java → West Java | 50 | Not reported | — | 2021 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Nusantara Regas Satu Terminal | Indonesia | Import | Operating | 22.7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Tegalgede-Muara Tawar Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Tegalgede-Muara Tawar Gas Pipeline run?
- Tegalgede-Muara Tawar Gas Pipeline runs from Central Java to West Java, crossing Indonesia.
- How long is Tegalgede-Muara Tawar Gas Pipeline?
- Tegalgede-Muara Tawar Gas Pipeline is 50 km long.
- How much gas can Tegalgede-Muara Tawar Gas Pipeline carry?
- No design capacity is reported for Tegalgede-Muara Tawar Gas Pipeline. That is an absent figure, not a zero.
- Is Tegalgede-Muara Tawar Gas Pipeline operating?
- Tegalgede-Muara Tawar Gas Pipeline is cancelled, with a reported start year of 2021.
- Who owns Tegalgede-Muara Tawar Gas Pipeline?
- Ownership of Tegalgede-Muara Tawar Gas Pipeline is not reported in the current tracker release.
- Does Tegalgede-Muara Tawar Gas Pipeline serve an LNG terminal?
- Tegalgede-Muara Tawar Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Indonesia
Listed in name order among the 50 pipelines tracked in Indonesia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Trans-Central Sumatra Gas PipelineSouth Sumatra to South Sumatra · 536 km
- Wampu-Belawan-Paya Pasir Gas Pipeline37 km
- West Kalimantan-Central Kalimantan Gas PipelineWest Kalimantan to Central Kalimantan · 1,018 km
- South Sumatra West Java Gas PipelineSouth Sumatra to West Java · 377 km
- South Sumatra West Java Phase II Gas PipelineSouth Sumatra to West Java · 628 km
- Tanjung Batu-Muara Badak Gas PipelineEast Kalimantan to East Kalimantan · 48 km