LNG Chain

Gas transmission pipeline · South West LNG Terminal to Ca Mau

South West LNG Terminal to Ca Mau Gas Pipeline

South West LNG Terminal to Ca Mau Gas Pipeline is a cancelled gas transmission pipeline in Vietnam. The tracker lists 1 tracked segment, 85 km long and 5 bcm/y of capacity, starting up in 2022. It runs from South West LNG Terminal to Ca Mau.

Length

85 km

Capacity

5 bcm/y

3.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 305 mm (12 in)

Route

South West LNG Terminal to Ca Mau Gas Pipeline runs from South West LNG Terminal to Ca Mau. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
South West LNG Terminal
To
Ca Mau
Start country
Vietnam
End country
Vietnam
Countries crossed
Vietnam
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
35 km
GEM pipeline ID
P3147
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledSouth West LNG Terminal → Ca Mau855305 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Ca Mau LNG TerminalVietnamImportProposed0.6 kmroute proximity
South West FSRUVietnamImportCancelledname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does South West LNG Terminal to Ca Mau Gas Pipeline run?
South West LNG Terminal to Ca Mau Gas Pipeline runs from South West LNG Terminal to Ca Mau, crossing Vietnam.
How long is South West LNG Terminal to Ca Mau Gas Pipeline?
South West LNG Terminal to Ca Mau Gas Pipeline is 85 km long.
How much gas can South West LNG Terminal to Ca Mau Gas Pipeline carry?
South West LNG Terminal to Ca Mau Gas Pipeline has a design capacity of 5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is South West LNG Terminal to Ca Mau Gas Pipeline operating?
South West LNG Terminal to Ca Mau Gas Pipeline is cancelled, with a reported start year of 2022.
Who owns South West LNG Terminal to Ca Mau Gas Pipeline?
Ownership of South West LNG Terminal to Ca Mau Gas Pipeline is not reported in the current tracker release.
Does South West LNG Terminal to Ca Mau Gas Pipeline serve an LNG terminal?
South West LNG Terminal to Ca Mau Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.