Šempeter-Ajdovščina Gas Pipeline

Šempeter-Ajdovščina Gas Pipeline is a proposed gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 30 km long and 12.28 bcm/y of capacity, starting up in 2028. It runs from Slovene Littoral to Slovene Littoral. It is owned by Plinovodi doo.

Length

30 km

Capacity

12.3 bcm/y

9.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 27940 mm (1100 in)

Route

No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.

From
Slovene Littoral
To
Slovene Littoral
Start country
Slovenia
End country
Slovenia
Countries crossed
Slovenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
Not reported
GEM pipeline ID
P6906
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedSlovene Littoral → Slovene Littoral3012.327940 mm2028No route

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Šempeter-Ajdovščina Gas Pipeline run?
Šempeter-Ajdovščina Gas Pipeline runs from Slovene Littoral to Slovene Littoral, crossing Slovenia.
How long is Šempeter-Ajdovščina Gas Pipeline?
Šempeter-Ajdovščina Gas Pipeline is 30 km long.
How much gas can Šempeter-Ajdovščina Gas Pipeline carry?
Šempeter-Ajdovščina Gas Pipeline has a design capacity of 12.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Šempeter-Ajdovščina Gas Pipeline operating?
Šempeter-Ajdovščina Gas Pipeline is proposed, with a reported start year of 2028.
Who owns Šempeter-Ajdovščina Gas Pipeline?
Šempeter-Ajdovščina Gas Pipeline is owned by Plinovodi doo, as recorded in the current tracker release.

More gas pipelines in Slovenia

Listed in name order among the 18 pipelines tracked in Slovenia, so projects with the same name sit together. A browse aid, not a claim that they are alike.