Gas transmission pipeline · Sakhalin to Hokkaido
Sakhalin-Hokkaido Gas Pipeline
Sakhalin-Hokkaido Gas Pipeline is a cancelled gas transmission pipeline crossing Russia, Japan. The tracker lists 1 tracked segment, 1,500 km long and 25 bcm/y of capacity. It runs from Sakhalin to Hokkaido. It is owned by Gazprom PJSC and Japanese Pipeline Development & Operation Inc.
Length
1,500 km
Capacity
25 bcm/y
18.4 Mtpa LNG equivalent
Segments tracked
1
Route
Sakhalin-Hokkaido Gas Pipeline runs from Sakhalin to Hokkaido. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sakhalin
- To
- Hokkaido
- Start country
- Russia
- End country
- Japan
- Countries crossed
- Russia, Japan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 1,397 km
- GEM pipeline ID
- P0828
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Sakhalin → Hokkaido | 1,500 | 25 | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Sakhalin II LNG Terminal | Russia | Export | Operating | 1.6 km | route proximity |
| Hachinohe LNG Terminal | Japan | Import | Operating | 3.2 km | route proximity |
| Hitachi LNG Terminal | Japan | Import | Operating | 4.3 km | route proximity |
| Ishikari LNG Terminal | Japan | Import | Operating | 5.2 km | route proximity |
| Sendai LNG Terminal | Japan | Import | Operating | 6.6 km | route proximity |
| Shin-Sendai LNG Terminal | Japan | Import | Operating | 7.8 km | route proximity |
| Soma Port LNG Terminal | Japan | Import | Operating | 17.4 km | route proximity |
| Hokkaido Electric Tomakomai LNG Terminal | Japan | Import | Proposed | — | name match |
| Hokkaido Gas Tomakomai LNG Terminal | Japan | Import | Proposed | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Sakhalin-Hokkaido Gas Pipeline run?
- Sakhalin-Hokkaido Gas Pipeline runs from Sakhalin to Hokkaido, crossing Russia and Japan.
- How long is Sakhalin-Hokkaido Gas Pipeline?
- Sakhalin-Hokkaido Gas Pipeline is 1,500 km long.
- How much gas can Sakhalin-Hokkaido Gas Pipeline carry?
- Sakhalin-Hokkaido Gas Pipeline has a design capacity of 25 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Sakhalin-Hokkaido Gas Pipeline operating?
- Sakhalin-Hokkaido Gas Pipeline is cancelled.
- Who owns Sakhalin-Hokkaido Gas Pipeline?
- Sakhalin-Hokkaido Gas Pipeline is owned by Gazprom PJSC and Japanese Pipeline Development & Operation Inc, as recorded in the current tracker release.
- Does Sakhalin-Hokkaido Gas Pipeline serve an LNG terminal?
- Sakhalin-Hokkaido Gas Pipeline passes within 25 km of 9 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.