Gas transmission pipeline · Chernivtsi Oblast to Bukovina
Romania-Ukraine Interconnector
Romania-Ukraine Interconnector is a cancelled gas transmission pipeline crossing Ukraine, Romania. The tracker lists 1 tracked segment, 30 km long and 2.81 bcm/y of capacity, starting up in 2025. It runs from Chernivtsi Oblast to Bukovina. It is owned by Gas Transmission System Operator of Ukraine.
Length
30 km
Capacity
2.81 bcm/y
2.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 701 mm (28 in)
Route
Romania-Ukraine Interconnector runs from Chernivtsi Oblast to Bukovina. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Chernivtsi Oblast
- To
- Bukovina
- Start country
- Ukraine
- End country
- Romania
- Countries crossed
- Ukraine, Romania
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 68 km
- GEM pipeline ID
- P1773
- Start year
- 2025
- Estimated cost (GEM, US dollars)
- $43.6 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Siret-Khotyn Gas Pipeline | Cancelled | Chernivtsi Oblast → Bukovina | 30 | 2.81 | 701 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Ukraine LNG Terminal | Ukraine | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
In the news
Recent headlines that name Romania-Ukraine Interconnector. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Romania-Ukraine Interconnector run?
- Romania-Ukraine Interconnector runs from Chernivtsi Oblast to Bukovina, crossing Ukraine and Romania.
- How long is Romania-Ukraine Interconnector?
- Romania-Ukraine Interconnector is 30 km long.
- How much gas can Romania-Ukraine Interconnector carry?
- Romania-Ukraine Interconnector has a design capacity of 2.81 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Romania-Ukraine Interconnector operating?
- Romania-Ukraine Interconnector is cancelled, with a reported start year of 2025.
- Who owns Romania-Ukraine Interconnector?
- Romania-Ukraine Interconnector is owned by Gas Transmission System Operator of Ukraine, as recorded in the current tracker release.
- Does Romania-Ukraine Interconnector serve an LNG terminal?
- Romania-Ukraine Interconnector passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Ukraine
Listed in name order among the 25 pipelines tracked in Ukraine, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Rozdilna-Izmail Gas Pipeline230 km
- Shebelinka-Dikanka-Kiev Gas Pipeline522 km
- Shebelinka-Dnipropetrovsk–Kryvyi Rih–Rozdilna-Izmail Gas Pipeline164 km
- Orenburg-Novopskov Gas PipelineOrenburg to Luhansk · 1,230 km
- Ostrogozhsk-Shebelinka Gas PipelineVoronezh to Kharkiv · 312 km
- Petrovsk-Novopskov Gas PipelineSaratov Oblast to Luhansk · 609 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.