LNG Atlas

Gas transmission pipeline · Romania – Serbia

Romania-Serbia Interconnection Gas Pipeline

Romania-Serbia Interconnection Gas Pipeline is a proposed gas transmission pipeline crossing Romania, Serbia. The tracker lists 1 tracked segment, 97 km long and 1.6 bcm/y of capacity, starting up in 2023. It is owned by Norilsktransgaz JSC.

Length

97 km

Capacity

1.6 bcm/y

1.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 15240 mm (600 in)

Route

Romania-Serbia Interconnection Gas Pipeline runs from Romania – Serbia. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Romania
End country
Serbia
Countries crossed
Romania, Serbia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
93 km
GEM pipeline ID
P1706
Start year
2023
Estimated cost (GEM, US dollars)
$94.6 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedNot reported971.615240 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Romania-Serbia Interconnection Gas Pipeline run?
Romania-Serbia Interconnection Gas Pipeline runs from Romania to Serbia, crossing Romania and Serbia.
How long is Romania-Serbia Interconnection Gas Pipeline?
Romania-Serbia Interconnection Gas Pipeline is 97 km long.
How much gas can Romania-Serbia Interconnection Gas Pipeline carry?
Romania-Serbia Interconnection Gas Pipeline has a design capacity of 1.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Romania-Serbia Interconnection Gas Pipeline operating?
Romania-Serbia Interconnection Gas Pipeline is proposed, with a reported start year of 2023.
Who owns Romania-Serbia Interconnection Gas Pipeline?
Romania-Serbia Interconnection Gas Pipeline is owned by Norilsktransgaz JSC, as recorded in the current tracker release.

More gas pipelines in Romania

Listed in name order among the 27 pipelines tracked in Romania, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail