Razlog-Bansko Gas Pipeline

Razlog-Bansko Gas Pipeline is a proposed gas transmission pipeline in Bulgaria. The tracker lists 1 tracked segment, 37 km long, starting up in 2029. It is owned by Bulgartransgaz.

Length

37 km

Capacity

Not reported

Segments tracked

1

Largest diameter 6350 mm (250 in)

Route

Razlog-Bansko Gas Pipeline runs from Bulgaria. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Bulgaria
End country
Bulgaria
Countries crossed
Bulgaria
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
5.4 km
GEM pipeline ID
P2088
Start year
2029
Estimated cost (GEM, US dollars)
$26.2 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedNot reported37Not reported6350 mm2029GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Razlog-Bansko Gas Pipeline run?
Razlog-Bansko Gas Pipeline is recorded in Bulgaria. Global Energy Monitor reports no start and end points for it.
How long is Razlog-Bansko Gas Pipeline?
Razlog-Bansko Gas Pipeline is 37 km long.
How much gas can Razlog-Bansko Gas Pipeline carry?
No design capacity is reported for Razlog-Bansko Gas Pipeline. That is an absent figure, not a zero.
Is Razlog-Bansko Gas Pipeline operating?
Razlog-Bansko Gas Pipeline is proposed, with a reported start year of 2029.
Who owns Razlog-Bansko Gas Pipeline?
Razlog-Bansko Gas Pipeline is owned by Bulgartransgaz, as recorded in the current tracker release.

More gas pipelines in Bulgaria

Listed in name order among the 35 pipelines tracked in Bulgaria, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail