Perito Moreno Gas Pipeline

Perito Moreno Gas Pipeline is a proposed gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 569 km long and 7.3 bcm/y of capacity, starting up in 2027. It runs from Neuquén to Buenos Aires. It is owned by ENARSA.

Length

569 km

Capacity

7.3 bcm/y

5.4 Mtpa LNG equivalent

Segments tracked

1

Route

Perito Moreno Gas Pipeline runs from Neuquén to Buenos Aires. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Neuquén
To
Buenos Aires
Start country
Argentina
End country
Argentina
Countries crossed
Argentina
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
568 km
GEM pipeline ID
P7775
Start year
2027
Estimated cost (GEM, US dollars)
$500 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase 1 expansionProposedNeuquén → Buenos Aires5697.3—2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Perito Moreno Gas Pipeline run?
Perito Moreno Gas Pipeline runs from Neuquén to Buenos Aires, crossing Argentina.
How long is Perito Moreno Gas Pipeline?
Perito Moreno Gas Pipeline is 569 km long.
How much gas can Perito Moreno Gas Pipeline carry?
Perito Moreno Gas Pipeline has a design capacity of 7.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Perito Moreno Gas Pipeline operating?
Perito Moreno Gas Pipeline is proposed, with a reported start year of 2027.
Who owns Perito Moreno Gas Pipeline?
Perito Moreno Gas Pipeline is owned by ENARSA, as recorded in the current tracker release.

More gas pipelines in Argentina

Listed in name order among the 50 pipelines tracked in Argentina, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail