Gas transmission pipeline · Texas to Agua Dulce Hub
Pecos Trail Pipeline
Pecos Trail Pipeline is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 753 km long and 18.91 bcm/y of capacity, starting up in 2019. It runs from Texas to Agua Dulce Hub. It is owned by Pecos Trail Pipeline Co.
Length
753 km
Capacity
18.9 bcm/y
13.9 Mtpa LNG equivalent
Segments tracked
1
Route
Pecos Trail Pipeline runs from Texas to Agua Dulce Hub. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Texas
- To
- Agua Dulce Hub
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 737 km
- GEM pipeline ID
- P0289
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Texas → Agua Dulce Hub | 753 | 18.9 | — | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Coastal Bend LNG Terminal | United States | Export | Proposed | 13.4 km | route proximity |
| South Texas LNG Terminal | United States | Export | Cancelled | 18.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Pecos Trail Pipeline run?
- Pecos Trail Pipeline runs from Texas to Agua Dulce Hub, crossing United States.
- How long is Pecos Trail Pipeline?
- Pecos Trail Pipeline is 753 km long.
- How much gas can Pecos Trail Pipeline carry?
- Pecos Trail Pipeline has a design capacity of 18.9 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Pecos Trail Pipeline operating?
- Pecos Trail Pipeline is cancelled, with a reported start year of 2019.
- Who owns Pecos Trail Pipeline?
- Pecos Trail Pipeline is owned by Pecos Trail Pipeline Co, as recorded in the current tracker release.
- Does Pecos Trail Pipeline serve an LNG terminal?
- Pecos Trail Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.