Gas transmission pipeline · Croatia
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is a proposed gas transmission pipeline in Croatia. The tracker lists 1 tracked segment, 128 km long, starting up in 2030. It is owned by Plinacro Ltd.
Length
128 km
Capacity
Not reported
Segments tracked
1
Largest diameter 20320 mm (800 in)
Route
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline runs from Croatia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Croatia
- End country
- Croatia
- Countries crossed
- Croatia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 115 km
- GEM pipeline ID
- P2191
- Start year
- 2030
- Estimated cost (GEM, US dollars)
- $154 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Kozarac-Slobodnica | Proposed | Not reported | 128 | Not reported | 20320 mm | 2030 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Plinacro Ltd100%
Parent companies
- Plinacro doo100%
In the news
Recent headlines that name Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline run?
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is recorded in Croatia. Global Energy Monitor reports no start and end points for it.
- How long is Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline?
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is 128 km long.
- How much gas can Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline carry?
- No design capacity is reported for Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline. That is an absent figure, not a zero.
- Is Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline operating?
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is proposed, with a reported start year of 2030.
- Who owns Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline?
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is owned by Plinacro Ltd, as recorded in the current tracker release.
More gas pipelines in Croatia
Listed in name order among the 22 pipelines tracked in Croatia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline102 km
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline20 km
- Rijeka–Pula Gas Pipeline95 km
- Lucko–Bosiljevo Gas Pipeline65 km
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline18 km
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline58 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.