Gas transmission pipeline · Brandenburg to Brandenburg
Lauchhammer 2 - Großkoschen Gas Pipeline
Lauchhammer 2 - Großkoschen Gas Pipeline is a shelved gas transmission pipeline in Germany. The tracker lists 1 tracked segment, 28 km long, starting up in 2027. It runs from Brandenburg to Brandenburg. It is owned by ONTRAS.
Length
28 km
Capacity
Not reported
Segments tracked
1
Largest diameter 20320 mm (800 in)
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Brandenburg
- To
- Brandenburg
- Start country
- Germany
- End country
- Germany
- Countries crossed
- Germany
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P5493
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Shelved | Brandenburg → Brandenburg | 28 | Not reported | 20320 mm | 2027 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
In the news
Recent headlines that name Lauchhammer 2 - Großkoschen Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Lauchhammer 2 - Großkoschen Gas Pipeline run?
- Lauchhammer 2 - Großkoschen Gas Pipeline runs from Brandenburg to Brandenburg, crossing Germany.
- How long is Lauchhammer 2 - Großkoschen Gas Pipeline?
- Lauchhammer 2 - Großkoschen Gas Pipeline is 28 km long.
- How much gas can Lauchhammer 2 - Großkoschen Gas Pipeline carry?
- No design capacity is reported for Lauchhammer 2 - Großkoschen Gas Pipeline. That is an absent figure, not a zero.
- Is Lauchhammer 2 - Großkoschen Gas Pipeline operating?
- Lauchhammer 2 - Großkoschen Gas Pipeline is shelved, with a reported start year of 2027.
- Who owns Lauchhammer 2 - Großkoschen Gas Pipeline?
- Lauchhammer 2 - Großkoschen Gas Pipeline is owned by ONTRAS, as recorded in the current tracker release.
More gas pipelines in Germany
Listed in name order among the 90 pipelines tracked in Germany, so projects with the same name sit together. A browse aid, not a claim that they are alike.