LNG Chain

Gas transmission pipeline · Kysyl-Syr to Khabarovsk Krai

Kysyl-Syr-Amga-Ayan Gas Pipeline

Kysyl-Syr-Amga-Ayan Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,358 km long and 28 bcm/y of capacity, starting up in 2027. It runs from Kysyl-Syr to Khabarovsk Krai. It is owned by Globaltec LLC.

Length

1,358 km

Capacity

28 bcm/y

20.6 Mtpa LNG equivalent

Segments tracked

1

Route

Kysyl-Syr-Amga-Ayan Gas Pipeline runs from Kysyl-Syr to Khabarovsk Krai. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kysyl-Syr
To
Khabarovsk Krai
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
1,217 km
GEM pipeline ID
P3896
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedKysyl-Syr → Khabarovsk Krai1,358282027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Yakutia LNG ProjectRussiaExportShelved0.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Kysyl-Syr-Amga-Ayan Gas Pipeline run?
Kysyl-Syr-Amga-Ayan Gas Pipeline runs from Kysyl-Syr to Khabarovsk Krai, crossing Russia.
How long is Kysyl-Syr-Amga-Ayan Gas Pipeline?
Kysyl-Syr-Amga-Ayan Gas Pipeline is 1,358 km long.
How much gas can Kysyl-Syr-Amga-Ayan Gas Pipeline carry?
Kysyl-Syr-Amga-Ayan Gas Pipeline has a design capacity of 28 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Kysyl-Syr-Amga-Ayan Gas Pipeline operating?
Kysyl-Syr-Amga-Ayan Gas Pipeline is proposed, with a reported start year of 2027.
Who owns Kysyl-Syr-Amga-Ayan Gas Pipeline?
Kysyl-Syr-Amga-Ayan Gas Pipeline is owned by Globaltec LLC, as recorded in the current tracker release.
Does Kysyl-Syr-Amga-Ayan Gas Pipeline serve an LNG terminal?
Kysyl-Syr-Amga-Ayan Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.