Gas transmission pipeline · Karachaganak to Oral
Karachaganak-Uralsk Gas Pipeline
Karachaganak-Uralsk Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 152 km long, starting up in 2028. It runs from Karachaganak to Oral. It is owned by QazaqGaz.
Length
152 km
Capacity
Not reported
Segments tracked
1
Route
Karachaganak-Uralsk Gas Pipeline runs from Karachaganak to Oral. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Karachaganak
- To
- Oral
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 133 km
- GEM pipeline ID
- P7819
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| II | Proposed | Karachaganak → Oral | 152 | Not reported | — | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- QazaqGaz100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Karachaganak-Uralsk Gas Pipeline run?
- Karachaganak-Uralsk Gas Pipeline runs from Karachaganak to Oral, crossing Kazakhstan.
- How long is Karachaganak-Uralsk Gas Pipeline?
- Karachaganak-Uralsk Gas Pipeline is 152 km long.
- How much gas can Karachaganak-Uralsk Gas Pipeline carry?
- No design capacity is reported for Karachaganak-Uralsk Gas Pipeline. That is an absent figure, not a zero.
- Is Karachaganak-Uralsk Gas Pipeline operating?
- Karachaganak-Uralsk Gas Pipeline is proposed, with a reported start year of 2028.
- Who owns Karachaganak-Uralsk Gas Pipeline?
- Karachaganak-Uralsk Gas Pipeline is owned by QazaqGaz, as recorded in the current tracker release.