Gas transmission pipeline · East Kalimantan to Central Java
Kalija II Gas Pipeline
Kalija II Gas Pipeline is a proposed gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 1,200 km long. It runs from East Kalimantan to Central Java. It is owned by PT Kalimantan Jawa Gas.
Length
1,200 km
Capacity
Not reported
Segments tracked
1
Route
Kalija II Gas Pipeline runs from East Kalimantan to Central Java. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- East Kalimantan
- To
- Central Java
- Start country
- Indonesia
- End country
- Indonesia
- Countries crossed
- Indonesia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,026 km
- GEM pipeline ID
- P0972
- Start year
- Not reported
- Shelved (year GEM records)
- 2009
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | East Kalimantan → Central Java | 1,200 | Not reported | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Kalija II Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Kalija II Gas Pipeline run?
- Kalija II Gas Pipeline runs from East Kalimantan to Central Java, crossing Indonesia.
- How long is Kalija II Gas Pipeline?
- Kalija II Gas Pipeline is 1,200 km long.
- How much gas can Kalija II Gas Pipeline carry?
- No design capacity is reported for Kalija II Gas Pipeline. That is an absent figure, not a zero.
- Is Kalija II Gas Pipeline operating?
- Kalija II Gas Pipeline is proposed.
- Who owns Kalija II Gas Pipeline?
- Kalija II Gas Pipeline is owned by PT Kalimantan Jawa Gas, as recorded in the current tracker release.
More gas pipelines in Indonesia
Listed in name order among the 50 pipelines tracked in Indonesia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Kandang Haur Timur - Cilamaya Gas Pipeline IWest Java to West Java · 59 km
- Kandang Haur Timur - Cilamaya Gas Pipeline IIWest Java to West Java · 59 km
- Kawasan Industri Medan (KIM) – Kawasan Ekonomi Khusus (KEK) Sei Mangke Gas PipelineNorth Sumatra to North Sumatra · 127 km
- Gresik-Pusri Gas PipelineSouth Sumatra to South Sumatra · 176 km
- Gresik-Semarang Gas Pipeline275 km
- Kalija Gas Pipeline207 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.